2013 Conference and Exhibition of the Transportaion Association of CanadaTAC/ATC - Les transports : toujours mieux, plus vites et plus sûrs

OUVRAGES D’ART  (B) (SÉ)


STRUCTURES (B) (SES)

Organisé par le Comité permanent des ouvrages d’art de l’ATC
Organized by TAC’s Structures Standing Committee

Président / Chair: Ruth Eden, Director, Structures Design and Construction Branch, Water Management and

Structures, Manitoba Infrastructure and Transportation

CABLE IMPREGNATION FOR POST-TENSION GROUTING PROBLEMS
David Whitmore, Cable Impregnation for Post-Tension Grouting Problems, Vector Corrosion Technologies; Ivan Lasa

DESIGN OF THE NEW NY (TAPPAN ZEE) BRIDGE CABLE-STAYED MAIN SPAN
Christopher Scollard, Chief Project Manager, Buckland & Taylor Ltd.; Don Bergman; Armin Schemman; Matthew Kleymann; Tjen Tjhin

EXTENDING THE LIFE OF THE ANGUS L. MACDONALD SUSPENSION BRIDGE
Dusan Radojevic, Chief Specialist, Buckland & Taylor Ltd.; Peter Buckland; Keith Kirkwood; Jon Eppell

ÉRECTION D’UNE CHARPENTE D’ACIER PAR LA MÉTHODE DE LANCEMENT
Jacques Blouin, directeur, Génie des ponts, Québec, WSP; Stephan Kellner (Exposé non disponible)

LIGHTWEIGHT FIBERGLASS COMPOSITE BRIDGE PANEL SYSTEM
Crawford Dewar, Guardian Bridge Rapid Construction Inc .(Exposé non disponible)

LONG-TERM PERFORMANCE OF ELECTROCHEMICAL CHLORIDE EXTRACTION AND CATHODIC PROTECTION OF BRIDGE SUBSTRUCTURES: HIGHWAY 75 / 100 INTERCHANGE CASE STUDY
David Whitmore, Cable Impregnation for Post-Tension Grouting Problems, Vector Corrosion Technologies; Ruth Eden; Felix Sandron (Exposé non disponible)

STATE-OF-THE-ART BRIDGE DECK CONDITION EVALUATION AND MANAGEMENT USING GROUND PENETRATING RADAR
Christopher Barnes, Senior Materials Engineer, AMEC Environment & Infrastructure