 
 
 
  |
BRIDGES
– ENGINEERING IMPACTING SOCIETY (B) (SESSION)
PONTS – INCIDENCES DES TECHNIQUES D’INGÉNIERIE
SUR LA SOCIÉTÉ (B) (SÉANCE)
Chair / Président : Brad Neirinck, Bridge Planning and
Operations Engineer, City of Winnipeg
BRIDGES ON THE TRANS LABRADOR HIGHWAY
– Gordon Jin, Bridge Design Engineer, Peter Lester, Chief Bridge
Engineer, and Terry McCarthy, Senior Coordinator, Highway Design
and Construction Division, Newfoundland Works, Services and Transportation,
St. John’s
THE
MISSING NEWFOUNDLAND-LABRADOR FIXED LINK – Tom Kierans, Self-employed
Professional Engineer, St. John’s; Overton A. Colbourne, Corner
Brook, NL; Howard Markham, Director, HK Consult Limited, Hong Kong
ALBERTA
GUIDELINES FOR UPGRADING BRIDGE RAILS AND APPROACH GUARD RAIL TRANSITIONS
– Raymond Yu, Structural Standards Engineer, Clive Clarke,
Structural Engineering Specialist, and Bill Kenny, Geometric Standards
Specialist, Alberta Transportation, Edmonton; Bob Ramsay, Senior
Bridge Engineer, UMA Engineering Ltd., Edmonton
EMBEDDED
GALVANIC ANODES INCREASE SUSTAINABILITY OF REINFORCED CONCRETE STRUCTURES
– David Whitmore, Vice-president, and Sean Abbott, Vector Corrosion
Technologies, Winnipeg
ENVIRONMENTAL
MANAGEMENT OF AGED BRIDGE STRUCTURES IN PEI – Darrell Evans,
Manager, Design and Bridge Maintenance, and Brian Thompson, Manager,
Environmental Management Division, Prince Edward Island Transportation
and Public Works, Charlottetown
 
Photos: left side
- Avalon Convention & Visitors Bureau; top - Tourism St. John's.
Copyright 2003 Transportation Association of Canada. All rights reserved.
|