STRUCTURES (A) (SES)
OUVRAGES D’ART (A) (SÉ)
Organized by TAC’s Structures Standing Committee
Organisé par le Comité permanent des ouvrages d’art de l’ATC
Chair / Présidente : Ruth Eden, Director of Structures, Manitoba Infrastructure and Transportation
- 2014 MANITOBA SOUTHWEST REGION BRIDGE FLOOD RESPONSE AND RECOVERY
Troy Hengen, Bridge Inspection Engineer, Manitoba Infrastructure and Transportation; Russ Andrushuk; Ruth Eden; Drew Monnier
- THE DESIGN & CONSTRUCTION OF CONTINUOUS STEEL CURVED BOX GIRDER BRIDGES
Hugues Latulippe, Bridges Project Manager, Transportation, WSP Canada Inc.; Mouloud Gougam (no paper available)
- DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION
Vireak Hinh, Structural Engineer, R.V. Anderson Associates; Jennifer Trimble
- BUMP DETERMINATION AT BRIDGE APPROACH TRANSITIONS USING INERTIAL PROFILERS
Chris Olmedo, Engineering Intern, Stantec Consulting Ltd.; Brandt Henderson; Gabe Cimini; Jack Springer
- BUILD A SAFE BRIDGE OVER WORKED COAL MINES
Zichao Wu, Bridge Technical Manager, AECOM Canada; Bo Hu; Sheldon Foley; Rob Richardson
- THE UNIVERSITY BRIDGE ARCH ASSESSMENT – A NEW APPROACH
Glyn Kennell, Research Engineer, University of Saskatchewan; Jim Zacaruk; Gang Li; Moh Boulfiza