ForewordAbout UsPapers by AuthorPapers by TitleProducts & ServicesContact UsExit
 




PRESERVING LOW-VOLUME ROAD INVESTMENTS (SESSION)

OPTIMISATION DES INVESTISSEMENTS DANS LES ROUTES À FAIBLE DÉBIT (SÉANCE)

    
   

Chair / Président : Guy Tremblay, chef, Service des chaussées, ministère des Transports du Québec, Québec

GUIDELINES FOR UPGRADING LOW VOLUME ROADS IN SASKATCHEWAN – Harold Retzlaff, Design Engineer, Sukhy Kent, Director of Design and Traffic Operations, Diana Podborochynski, Design Standards Intern, and Jarron Krawec, Design Standards Intern, Saskatchewan Highways and Transportation, Regina

SELECTION OF SURFACE TYPE FOR LOW VOLUME ROADS – D.J. Swan, Pavement Engineer,David K. Hein, Vice-president, and Jerry J. Hajek, President, Applied Research Associates, Inc., Toronto

USING CEMENT TO RECLAIM ASPHALT PAVEMENTS – Gregory E. Halsted, Soil-Cement / RCC Pavements Engineer, Portland Cement Association, Bellingham, WA

NEW TWIST FOR STABILIZED ROADS – Doug Wright, Area Manager, British Columbia Ministry of Transportation, Courtenay, BC

LOW-VOLUME ROAD GRADING MAINTENANCE MANAGEMENT: NEW ZEALAND EXPERIENCE WITH A CANADIAN SYSTEM – Robert A. Douglas, Senior Project Manager, Golder Associates Ltd., Mississauga, ON; Bryan Pidwerbesky, Fulton Hogan Ltd., Christchurch, New Zealand; Steve Mercier, Forest Engineering Research Institute of Canada