RÉPARATION D’URGENCE ET RECONSTRUCTION DES INFRASTRUCTURES DE TRANSPORT (SÉ)
EMERGENCY REPAIR AND RECONSTRUCTION OF TRANSPORTATION INFRASTRUCTURE (SES)
Organisé par le Comité permanent des sols et des matériaux de l’ATC
Organized by TAC’s Soils and Materials Standing Committee
Président / Chair: Daryl Nixon, Principal Specialist – Pavements, Prairie Region, Tetra Tech
AKAMINA PARKWAY RECONSTRUCTION AND HAZARD MITIGATION
Scott Martin, Vice President, Pacific Engineering, Tetra Tech EBA; Brian Cutts; Tara Hirsekorn; Jamie Sterling; Joel Kliner; Charles Hunt
HIGHWAY 40 SOUTH OF KANANASKIS LAKES – EPICENTRE OF THE STORM
Des Kernahan, Senior Transportation Engineer, Associated Engineering and Erin Rooney, Biologist/Regional Manager, Summit Environmental
PAVEMENT EVALUATION TO DETECT POTENTIAL VOIDS UNDER THE SURFACE AFTER THE HISTORIC FLOOD OF JUNE 2013 IN THE CITY OF CALGARY
Mohammad Karim, Business Strategist, City of Calgary; Dave Palsat; Vipin Sharma; Bryan Palsat; Art Johnston; Joe Chyc-Cies
RÉPARATION D’URGENCE D’UNE ROUTE EMPORTÉE PAR UN GLISSEMENT DE TERRAIN DANS DES ARGILES SENSIBLES, SAINT-DENIS-SUR-RICHELIEU, QUÉBEC
Catherine Thibault, ingénieure, Section des mouvements de terrain, ministère des Transports du Québec; Maryse Létourneau
BOW RIVER BRIDGE NEAR GLEICHEN, AB, AFTER THE FLOOD
Laurie McCarron, Bridge Engineer, Stantec Consulting Ltd.; Caroline Watt