BRIDGES – ENGINEERING IMPACTING SOCIETY (A) (SESSION)

PONTS – INCIDENCES DES TECHNIQUES D’INGÉNIERIE SUR LA SOCIÉTÉ (A) (SÉANCE)








Chair / Président : Brad Neirinck, Bridge Planning and Operations Engineer, City of Winnipeg


MEDICINE RIVER BRIDGE REHABILITATION – Bob Ramsay, Senior Bridge Engineer, UMA Engineering Ltd., Edmonton

F.G. GARDINER EXPRESSWAY DISMANTLING PROJECT FROM THE DON ROADWAY TO LESLIE STREET – David Crichton, Manager, Design & Construction, and Kathleen Llewellyn-Thomas, Director, Development Engineering, Works and Emergency Services, City of Toronto

PROVENCHER CABLE-STAYED PEDESTRIAN BRIDGE – Robert van Ginkel, Principal and Manager, Transportation Infrastructure, and Emile Shehata, Wardrop Engineering, Winnipeg; Bill Ebenspanger, Bridge Design and Project Engineer, Public Works Department, City of Winnipeg

CONCEPTION DE GLISSIÈRES DE BÉTON RENFORCÉES AVEC DE L'ARMATURE EN MATÉRIAUX COMPOSITES (DESIGN OF BRIDGE BARRIER WALLS REINFORCED WITH GFRP BARS) – Gérard Desgagné, chef, Service de la conception, ministère des Transports du Québec, Québec, et Brahim Benmokrane, Université de Sherbrooke (QC)

SOIL-STEEL STRUCTURES AND THE CANADIAN HIGHWAY BRIDGE DESIGN CODE – Shane Finlay, Engineering Manager, Patrick Biro, Junior Designer, and Heba Ahmed, Junior Designer, Armtec Limited, Guelph, ON





Photos: left side - Avalon Convention & Visitors Bureau; top - Tourism St. John's.
Copyright 2003 Transportation Association of Canada. All rights reserved.