BRIDGES FOR THE 21st CENTURY (B) (SESSION)

PONTS DU XXIe SIÈCLE (B) (SÉANCE)



Chair / Président : Howard Yea, Director, Bridge Services, Saskatchewan Highways and Transportation, Regina

PERFORMANCE OF HEADED SHEAR STUD CLUSTERS FOR PRECAST CONCRETE BRIDGE DECK PANELS – Kent Evan LaRose, Bridge Engineer, McElhanney Consulting Services Ltd., Surrey, BC

ACCELERATED BRIDGE CONSTRUCTION – John R. Fowler, Canadian Precast/Prestressed Concrete Institute, Ottawa

INNOVATIVE PRECAST CONCRETE DECK SLABS – S. (Bala) Balakrishnan, Senior Bridge Specialist, Associated Engineering Alberta Ltd., Edmonton

CHALLENGES OF THE GREAT BEAR RIVER BRIDGE – Mekdam Nima, Bridge Manager, Michel Lanteigne, Zichao Wu, Naheed Ahmad and Nick Bevington, Earth Tech (Canada) Ltd., Edmonton

MAJOR SAVINGS WITH CULVERT RELINING SYSTEMS – Daniel Crevier, Regional Sales Director, KWH Pipe Canada, Montreal