BRIDGES – ADJUSTING TO NEW REALITIES (A) (SESSION)
PONTS : AU DIAPASON DES NOUVELLES RÉALITÉS (A) (SÉANCE)


Chair / Président : Robert van Ginkel, Principal and Senior Project Manager, Wardrop Engineering Inc., Winnipeg
LOAD TESTING AND RATINGS OF SALVAGED PRECAST PRESTRESSED CONCRETE CHANNEL BRIDGE GIRDERS – Mike Lau, Associate, Dillon Consulting Limited, Winnipeg; Asnee Pochanart, AECOM Canada Limited; Ruth Eden, Manitoba Infrastructure and Transportation
ACCELERATED BRIDGE CONSTRUCTION - ON THE FAST TRACK TO SUCCESS – Rob Burak, President, Canadian Precast/Prestressed Concrete Institute, Ottawa; Rita Seraderian, Precast/Prestressed Concrete Institute, Northeast Region
USING STRUCTURAL MONITORING IN THE EVALUATION OF THE A. MURRAY MACKAY BRIDGE – John Newhook, Professor, Centre for Innovation in Infrastructure, and Joshua Levy, M.Sc. Candidate, Dalhousie University, Halifax; Peter Buckland, Principal, Buckland & Taylor Ltd.; Jon Eppell, Bridge Engineer, Halifax Harbour Bridges
INNOVATIVE FIELD CAST UHPC JOINTS FOR PRECAST BRIDGE SYSTEMS – 3-SPAN LIVE LOAD CONTINUOUS – Vic Perry, Vice-president and General Manager, Ductal, Lafarge Canada Inc., Calgary; Dick Dykstra, Philip Murray, Biljana Rajlic
INNOVATIVE STEEL BRIDGE ERECTION TECHNIQUES – Prabhjeet Raj Singh, Vice-president, and Matthias Schueller, Principal, Infinity Engineering Group Ltd., North Vancouver; Matthew Bowser, M.Sc. Candidate, University of Waterloo, Waterloo, ON
RED RIVER FLOODWAY EXPANSION PROJECT - RAILWAY BRIDGE DESIGN CHALLENGES AND OUTCOMES – Jim Lukashenko, Manager, Bridges and Structures, MMM Group Limited, Winnipeg; Michael Hatch, MMM Group Limited
<< RETOURNER