OUVRAGES D’ART (A) (SÉ)
STRUCTURES (A) (SES)
Organisé par le Comité permanent des ouvrages d’art de l’ATC
Organized by TAC’s Structures Standing Committee
Partenaire / Partner: SNC-Lavalin Inc.
Président / Chair: Darrell Evans, Acting Assistant Director, Capital Projects Division, Prince Edward Island Transportation and Infrastructure Renewal
ROTATED-ELLIPSE ARCH PEDESTRIAN BRIDGE FOR THE CALGARY WEST LIGHT RAIL TRANSIT EXTENSION PROJECT
Edmund Ho, Project Engineer, MMM Group Limited; Monty Knaus
RELIABILITY-BASED LIFE CYCLE DESIGN OF RESILIENT HIGHWAY BRIDGES
Zoubir Lounis, Senior Research Officer, Civil Engineering Infrastructure, National Research Council Canada
PROPOSED DESIGN METHODOLOGY OF FIBER REINFORCED POLYMER ANCHORS WITH 90° BENDS INTO REINFORCED CONCRETE
Gaetano Bologna, Division Director of Transportation Infrastructure, Fyfe Company; Matt Gerpheide (Exposé non disponible)
FINITE ELEMENT ANALYSIS OF STRUCTURAL STEEL IMPACT DAMAGE AND HEAT STRAIGHTENING
Norman Fong, Research Assistant, University of Waterloo; Robert Gracie; Scott Walbridge
REHABILITATION WORKS FOR PINAWA BRIDGE OVER WINNIPEG RIVER
Vaibhav Banthia, Senior Structural Engineer, Tetra Tech EBA, Troy Hengen, Bridge Inspection Engineer, Manitoba Infrastructure and Transportation and Beth Phillips, Structural Engineer, Tetra Tech EBA
USE OF EPS AS A LIGHTWEIGHT FILL MATERIAL ON THE PORT MANN / HIGHWAY 1 IMPROVEMENT PROJECT, VANCOUVER TO LANGLEY, BC
Marek Buksowicz and
Stuart Culpan