2013 Conference and Exhibition of the Transportaion Association of Canada

STRUCTURES (B) (SES)

 

OUVRAGES D’ART (B) (SÉ)

Organized by TAC’s Structures Standing Committee
Organisé par le Comité permanent des ouvrages d’art de l’ATC

Chair / Président : Chris Haines, Associate, Dillon Consulting Ltd.

  • EXTENDING RESIDUAL SERVICE LIFE OF STEEL REINFORCED STRUCTURES BY THE USE OF GALVANIC ANODES
    Felix Sandron, Business Development Manager, Vector Corrosion Technologies; George Sergi;
    A. M. G. Seneviratne
    (no paper available)
  • EXTENDING THE LIFE OF THE ANGUS L. MACDONALD SUSPENSION BRIDGE - PROJECT UPDATE
    Thomas McNutt, Bridge Engineer, Buckland & Taylor (no paper available)
  • HODDER AVENUE UNDERPASS - AN INNOVATIVE BRIDGE SOLUTION WITH FIBRE-REINFORCED ULTRA-HIGH PERFORMANCE CONCRETE
    Eileen Li, Project Engineer and Philip Murray, Senior Vice President, Hatch Mott MacDonald; Biljana Rajlic; Liang Guo (no paper available)
  • GEOTECHNICAL CHALLENGES DURING THE CONSTRUCTION OF DENISON ROAD EAST RAILWAY GRADE SEPARATION
    Hans Vierhuis, Senior Bridge Engineer, R.V. Anderson Associates Limited; John Does; Siricius Augustin; Weiss Mehdawi
  • CHALLENGES AND INNOVATIVE SOLUTIONS FOR BRIDGE FOUNDATION REPAIRS
    Drew Monnier, Project Engineer, Manitoba Infrastructure and Transportation and Kim Yathon, Bridge Designer, Tetra Tech EBA Inc.; Ruth Eden; Emile Shehata; Randy Fingas
  • WINNIPEG RICHARDSON INTERNATIONAL AIRPORT: ELEVATED ROADWAY – DEPARTURES LEVEL BRIDGE
    Eric Loewen, Senior Bridge Engineer, AECOM; Asnee Pochanart; Todd Smith; Tanya Worms; Andrew Bromley