STRUCTURES (B) (SES)
OUVRAGES D’ART (B) (SÉ)
Organized by TAC’s Structures Standing Committee
Organisé par le Comité permanent des ouvrages d’art de l’ATC
Chair / Président : Chris Haines, Associate, Dillon Consulting Ltd.
- EXTENDING RESIDUAL SERVICE LIFE OF STEEL REINFORCED STRUCTURES BY THE USE OF GALVANIC ANODES
Felix Sandron, Business Development Manager, Vector Corrosion Technologies; George Sergi;
A. M. G. Seneviratne (no paper available)
- EXTENDING THE LIFE OF THE ANGUS L. MACDONALD SUSPENSION BRIDGE - PROJECT UPDATE
Thomas McNutt, Bridge Engineer, Buckland & Taylor (no paper available)
- HODDER AVENUE UNDERPASS - AN INNOVATIVE BRIDGE SOLUTION WITH FIBRE-REINFORCED ULTRA-HIGH PERFORMANCE CONCRETE
Eileen Li, Project Engineer and Philip Murray, Senior Vice President, Hatch Mott MacDonald; Biljana Rajlic; Liang Guo (no paper available)
- GEOTECHNICAL CHALLENGES DURING THE CONSTRUCTION OF DENISON ROAD EAST RAILWAY GRADE SEPARATION
Hans Vierhuis, Senior Bridge Engineer, R.V. Anderson Associates Limited; John Does; Siricius Augustin; Weiss Mehdawi
- CHALLENGES AND INNOVATIVE SOLUTIONS FOR BRIDGE FOUNDATION REPAIRS
Drew Monnier, Project Engineer, Manitoba Infrastructure and Transportation and Kim Yathon, Bridge Designer, Tetra Tech EBA Inc.; Ruth Eden; Emile Shehata; Randy Fingas
- WINNIPEG RICHARDSON INTERNATIONAL AIRPORT: ELEVATED ROADWAY – DEPARTURES LEVEL BRIDGE
Eric Loewen, Senior Bridge Engineer, AECOM; Asnee Pochanart; Todd Smith; Tanya Worms; Andrew Bromley