|
INNOVATIONS
EN MATIÈRE DE GÉNIE DES PONTS (A) (SÉANCE)
INNOVATIONS IN BRIDGE ENGINEERING (A) (SESSION)
Président / Chair: Howard Yea, Director, Bridge Services,
Saskatchewan Highways and Transportation, Regina
NETTOYAGE AUX ABRASIFS ET PEINTURAGE
DU PONT JACQUES-CARTIER, UN BILAN APRÈS 15 ANNÉES DE TRAVAUX
ET PLUS DE 40 M$ D'INVESTISSEMENTS – Guy Mailhot, directeur,
Génie, et Glen P. Carlin, directeur général,
Les Ponts Jacques Cartier et Champlain incorporée, Longueuil (QC)
ST. ANDREWS LOCK AND DAM CORROSION PROTECTION
SYSTEM – FIVE-YEAR CASE STUDY – David Bowen, Structural
Engineer, and Robert Van Ginkel, Vice-president, Transportation
Infrastructure, Wardrop Engineering, Winnipeg; John Davidson,
Senior Project Manager, Public Works and Government Services Canada
EVALUATION OF ALTERNATIVES FOR EXTENDING
THE SERVICE LIFE OF INTERSTATE ROUTE 480 VIADUCT SUBSTRUCTURE –
David Whitmore, Vice-president, Vector Corrosion Technologies,
Winnipeg; Sam Fallaha, Deputy State Bridge Engineer, Nebraska
Department of Roads
SINGLE STEEL BOX GIRDER BRIDGES FOR THE
TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT
– Srdjan Brasic, Manager, Structural Engineering, UMA Engineering
Limited, Mississauga, ON
CONCEPTS GÉNÉRAUX DE
LA SURVEILLANCE ÉLECTRONIQUE DES PONTS ROUTIERS AU MINISTÈRE
DES TRANSPORTS DU QUÉBEC – Jean-François LaFlamme,
ingénieur, et Marc Savard, ingénieur, ministère
des Transports du Québec, Québec
|
|